彩钢房的安装准备

网址:fangc.aou1.cn  2021-08-06  作者:admin    阅读:

彩钢房的安装准备
Installation Preparation of color steel room
1、复验安装定位所用的基础中心轴线、基础支承面标高或地脚螺栓的标高,并量出螺栓的具体位置,做好检测记录,超出允许偏差时,应做好技术处理。白钢雕塑 小型滚揉机 防火电缆 托辊设备 水刀切割机  铜钟 石雕狮子  校园不锈钢雕塑 扭王块模具
1. Recheck the foundation central axis, foundation bearing surface elevation or anchor bolt elevation used for installation and positioning, measure the specific position of bolts, and make inspection records. If the allowable deviation is exceeded, technical treatment shall be done.
2.钢柱基础混凝土强度必须达到设计强度,基础回填土已进行完毕。
2. The concrete strength of steel column foundation must reach the design strength, and the foundation backfill has been completed.
3、地脚螺栓(锚栓、应垂直,露出长度和丝牙长度应满足设计要求。丝牙无损伤,螺帽能紧到位。
3. The anchor bolt (anchor bolt and) shall be vertical, and the exposed length and thread length shall meet the design requirements. The thread teeth are not damaged and the nut can be tightened in place.
4、检查吊装机械及吊装机具。检查钢丝绳、滑轮、卡扣等能否满足使用要求,按专项施工方案要求搭设必要的脚手架或平台。
4. Check hoisting machinery and hoisting machines and tools. Check whether the steel wire rope, pulley, buckle, etc. can meet the use requirements, and set up necessary scaffolds or platforms according to the requirements of the special construction scheme.
5、钢柱、钢梁、屋架等成品、半成品的吊装,应编制吊装方案。对设计的拉杆在吊点位置,使受力改变为压杆时,为防止杆件失稳变形,必要时应加固和验算。
5. For the hoisting of finished and semi-finished products such as steel columns, steel beams and roof trusses, a hoisting scheme shall be prepared. When the designed pull rod is at the lifting point to change the stress into a compression rod, it shall be reinforced and checked if necessary to prevent the instability and deformation of the rod.
6、钢构件吊装前应清除其表面上的油污、冰雪、泥沙和灰尘等杂物。
6. Before hoisting of steel members, oil stain, ice and snow, sediment, dust and other sundries on their surfaces shall be removed.